HOME    ABOUT US    SERVICES    PROJECTS    CONTACT US
DEEPAK CONSTRUCTION
Mechanical & Civil Services
CALL US AT : +91374 2313737
PROJECTS
List of Major on going and Completed projects
CLIENT :BCPL(PROJECT -1 ) , LOCATION : LEPATKATA DIBRUGARH, ASSAM  (CURRENT)

Construction of 3 Naptha Storage tank 25.5 Mtr Dia x 25 Mtr Ht  of 11000Kl Floating Roof Tank including Ringwall Foundation (Design ,Supply, Fabrication, Erection, Calibration ,Testing, Painting & Commissioning )
CLIENT :BCPL(PROJECT -2 ) , LOCATION : LEPATKATA DIBRUGARH, ASSAM  (CURRENT)

Construction of  6 Storage Tanks , One Amine Storage, One Raw Pyrolysis Gasoline Storage tank, Two Hydrogenerated Pyrolysis asoline storage tank & Two Pyrolysis fuel oil storage tank (Design ,Supply, Fabrication, Erection, Calibration ,Testing, Painting & Commissioning)
CLIENT : S & L , LOCATION : SIVASAGAR, ASSAM

Revamp Project ,Construction of Five tanks Crude oil and water storage tanks, Plant Piping, Equipme nt erection and other reated Civil & Structural work at GGS-I
CLIENT : IOTL , LOCATION : TENGHAGHAT, ASSAM

Construction of Eight Storage tanks of 5000Kl ea ch for Crudeoil Dehydration facility at Tenghaghat OCS.
CLIENT : IOCL , LOCATION : PARADIP, ORISSA

Laying of Main Header along with Pumping Facili ty from Taldanda Canal to Paradip refinery(10km) for supply of Drinking water.
CLIENT : OIL INDIA , LOCATION : MORAN, ASSAM

Construction of Crude Oil Strorage tank,Laying of Pipeline, Installation of fire Fighting system, along with Instrumentation and Civil work (
Office Building).

CLIENT : OIL INDIA , LOCATION : MAKUM, ASSAM

Construction of two 795Kl Crude Oil Storage tanks along with other allied mechanical and civil work.
MISCELLANEOUS OTHER PROJECTS SITE COMPLETED SUCCESSFULLY


CLIENT : NRL , LOCATION : NUMALIGAR REFINERY , ASSAM

Mechanical & Piping Erection Work for Natural Gas Utilization Plant & Installation of new Fire protection system for existing tanks at Numaligarh Refinery Ltd.


CLIENT : ONGC , LOCATION : RUDRASAGAR , ASSAM

Construction of HP Gas Compressor Plant at GGS-II,Job involved Installation of H.P Gas Compressor, Shed, Piping Network, Instrumentation,  Civil work (Road, Building, Pump house) & Electricals.


CLIENT : IOCL(AOD) , LOCATION : DIGBOI , ASSAM

Construction of 36 Mtr Dia x 12 Mtr Ht  of 11000Kl Floating Roof Tank including Ringwall Foundation (Design ,Supply, Fabrication, Erection, Calibration ,Testing, Painting & Commissioning ) at Digboi Refinery.


CLIENT : BALMER & LAWRIE LTD , LOCATION : DIGBOI , ASSAM

Fabrication,  Erection, Calibration, Testing ,Painting & Commissioning of Fixed Roof cum Floating Roof type Storage Tank with Alluminum Roof including Civil Foundation and other allied Jobs at Digboi Refinery.


CLIENT : IOCL(AOD) , LOCATION : DIGBOI , ASSAM

Construction of Cone Roof Storage Tank for SDU at Digboi Refinery.


CLIENT : IOCL(AOD) , LOCATION : SEKMAI , MANIPUR

Installation of Fire Protection System for LPG Bottling Plant from 2䯠24䩡 Piping and other related work including construction of Civil Foundation, Pump Installation and Sprinkler System.


CLIENT : IOCL , LOCATION : SILUGURI

Modification of Fire Hydrant Line in and around Tank farm area inside Siluguri Terminal.


CLIENT : IOCL(AOD) , LOCATION : GOPANARI , ASSAM

Construction of Two 24Mtr Dia Fire Water Tanks including Rcc Ring wall Founda- -tion and Laying of LPG/AIR/WATER  Piplines including Civil and Structural Work at LPG Bottling Plant.


CLIENT : IOCL (AOD) , LOCATION : DIMAPUR , NAGALAND

Fire Fighting System Installation including Design, Engineering, Supply,Erection, Testing & Commissioning with Performance Guarantee at LPG Bottling Plant.


CLIENT : IOCL (AOD) , LOCATION : MUALKHANG , MIZORAM

Laying of Pipe Line and Installation of Fire Fighting System (Design, Engineering, Supply,Testing & Commissioning) with Performance Guarantee at LPG Bottling Plant.


CLIENT : IOCL (AOD) , LOCATION : DOIMUKH , ARUNACHAL PRADESH

Construction of Vertical MS Tanks (Three CR Tanks 20Mtr DIa x 8 Mtr Ht, 10Mtr Dia X 9Mtr Ht.& One FR Tanks 10Mtr Dia X 7.5 Mtr Ht). Supply,Erection,Testing & Commissioning .Other Job involved Installation of  Pressurized Hydrant System at Doimukh Depot (Seperately Done)




很多妈妈们都认为哺乳期以后胸部有再次变大的可能粉嫩公主酒酿蛋效果,也就是说哺乳期过了以后有机会进行一个乳房的二次发育丰胸最快方法,但是很多妈妈不知道怎样子才能让自己的乳房变大丰胸产品,今天我们就来了解一下断奶后怎么让胸部变大丰胸粉嫩公主